Pages

Saturday, January 8, 2011

applica[tion] - round 3

The task for today was to work on the structure of the gable at the front of the shed. ACCOMPLISHED! Brian had sketched out our collaborative design, that consisted of 1x4's spaced 1" apart in a horizontal pattern, with a center vertical behind to attach to. I've included a few process photos, as well as the finished product.
 
From inside, looking at Brian put the 4th of 6 boards on.
Brian finishing off that same 4th board.
What it looked like once the trim pieces were on, done!

No comments:

Post a Comment